15 Steps to a New Pool

Installing a liner pool may seem like a daunting task, but with the right expertise, it’s no big deal. The best part is, when working with Gold Coast Pools, the last step is the only one you need to worry about!

  1. The pool location and elevation are set
  2. Excavation begins
  3. Pool walls are set in place
  4. Adjustable braces and optional deck supports are installed
The walls of a steel pool are set in place and leveled.

The walls of a steel pool are set in place and leveled.

  1. The pool walls are leveled and squared using precise measuring tools
  2. The skimmer and inlets are set in place as well as plumbing
  3. A concrete footer is poured around perimeter of pool
  4. Concrete aggregate bottom is hand toweled in place
  5. The aluminum receptor is attached
  6. The pool is back filled and graded
  7. The concrete deck is poured
Concrete is poured to create the deck around a beautiful new backyard pool.

Concrete is poured to create the deck around a beautiful new backyard pool.

  1. The liner is vacuumed in place and begins filling
  2. The pool filtration is installed
  3. The hand rails are placed and auto cleaner installed
  4. Enjoy your new backyard vacation oasis!

Are you ready to create your own oasis? Contact us today!